Installation in Borgo Roma, Verona

Flue pipes

During the renovation of the heating plant of the Policlinico Hospital of Borgo Roma in Verona the installer used four twin wall Isotherm Ø1000 and Ø850 chimneys with a 50 mm high density mineral wool insulation.
All four chimneys were placed within a triangular framework that was placed on a reinforced concrete plinth built for this installation specifically.

The total height of each chimney is 20 m