Installation: 2 flues per the removal of the waste fumes of an industrial plant / Ronchis (UD) – Italy
Flue systems installed:
- 2 flues for industrial plant built with stainless steel, twin wall “Isotherm” components. Inner layer Ø350 – 50mm rockwool insulation – Outer layer Ø450